Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Apr 29, 2023     Wing Removal - (4 hours) Category: Wings
Removed wings for installation of wing tips, tank AD, landing lights, strobe lights-- then painting. Before removing horizontal stab and elevator, I configured the elevator trim indicator on the G3X. Verified up and down travel limits and neutral settings. Trim indicator works perfectly. FYI- you configure this indicator in the G3X aircraft and engine configuration section of the system configuration. Then, removed elevator and horizontal stab and hung on wall for safe storage. Moved parts and work tables around shop.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.